![Road works at Hexham until June Road works at Hexham until June](/images/transform/v1/crop/frm/H4rQr3kwJCDkT9nukzGYK/e7992504-bc37-4d1c-98b7-76f7b82da669.jpg/r0_0_1200_675_w1200_h678_fmax.jpg)
A reduced speed limit and intermittent lane closures will be in place from Tuesday on the Pacific Highway at Hexham for survey work.
Subscribe now for unlimited access.
or signup to continue reading
Work will be carried out from 7am to 5pm on weekdays, with some night work also required from 8pm to 4am on weeknights.
It is expected the work will be completed by early June, weather permitting.
For the safety of workers and motorists, changed traffic conditions will be in place including a reduced 40km/h speed limit and intermittent lane closures while work is carried out.
Roads and Maritime Services is carrying out the work, which will be staged along a six kilometre section of the highway and will involve surveying the road surface, road reserve, property boundaries, driveways and footpaths.
Motorists are advised to drive to the conditions, follow the direction of signs and traffic control.
Roads and Maritime thanked motorists in advance for their patience during the disruption.
For the latest traffic updates download the Live Traffic NSW App, visit www.livetraffic.com or call 132 701.